The following are brief descriptions of current county road improvement projects:
Pennington Road is a Collector Road, approximately 5,085 feet long that runs from Highway 101
to Mays Bridge Road. Design for Phase I improvements from Hwy 101 to Shore Vista Lane (3,745 feet)
is currently underway. Phase II improvements will be from the intersection of Mays Bridge Road to
Shore Vista Lane for a length of approximately 1,340 feet. The scope of work for Phase II will
include but not be limited to design and construction of the roadway/shoulder/ditches from Mays
Bridge Road to Shore Vista Lane and performing all design, hydrological analysis and permitting
necessary to replace the existing culvert at the creek crossing near the intersection of Pennington
and Shore Vista Lane. Survey at the creek crossing and preliminary hydrology work are currently being
performed. The new structure must satisfy County Floodplain Ordinance requirements. Right of way
acquisition may also be required.
Project Location Map
|
Cobblestone Drive is a local Residential Road that runs from Gilderbrook Road to Lynchester Road,
a length of 2,010 feet. There is an existing precast concrete bridge at the Rocky Creek crossing.
The bridge deck is 45 feet long by 26 feet wide (three (3) - 15 feet concrete spans). The scope of
work for this project will include but not be limited to performing all design, hydrological analysis
and permitting necessary to replace the existing structure with a single span. The structure must
satisfy County Floodplain Ordinance requirements.
Project Location Map
|