01 Week 1 Metal Subfloor
02 Week 1 Orange Tarp covering Exisiting Wall to Dispatch Center
03 Week 1 Another Angle of Metal Flooring
04 Week1 SubFloor
05 Week1 Subfloor
06 WK1 Plywood Floor
07 WK1 Plywood Floor
08 WK1 Plywood Floor
09 WK1 Plywood Floor
10 WK1 Framing for Walls and 3 Windows
11 WK1 Framing for Walls and 3 Windows
12 Week 1 Door to Existing Center Showing the Addition
13 Week 1 Hallway to Main Offices before Vending Machines were Removed
25 Week 3 Outside Wall with Opening for the 3 Windows
26 Week 3 Another Angle of Outside Wall
27 Week 3 Exisiting Door into Communications Center with addition to the Right
28 Week 3 Inside Additional Space facing the Exisiting Communications Center with Wall Removed
29 Week 3 Inside Facing the Bay Doors
30 Week 3 Black Tarp is all that Seperates the New and Old Space
31 Week 3 New Door that Exits to the EMS Administrative Offices
32 Week 3 Installing the Window Frames